Yari to commence inaugural drill campaign at Rolleston South Coal Project in Bowen Basin, QLD
• Yari has secured key regulatory and landholder approvals to commence drilling at the flagship Rolleston South Coal Project in the world-class Bowen Basin
• The Rolleston South Coal Project sits ~15km from Glencore’s Rolleston Mine and benefits from excellent infrastructure including sealed roads and rail network to Gladstone Port
• Yari appointed Xenith Consulting as the drilling program project manager, featuring six reverse circulation (RC) and diamond drill holes spanning 2,000m
• The program aims to:
- Test high-priority targets to potentially upgrade the existing 190Mt JORC Inferred Resource to Indicated status;
- Confirm high-quality semi-soft metallurgical coal through targeted test-work using diamond-drilled core samples; and
- Conduct geotechnical assessments to inform and support future studies
• Yari has proactively begun logistical preparation including setting up drilling pads to ensure seamless start to the campaign
• The Board is confident that the inaugural drilling campaign will deliver valuable insights, including the potential upgrade of the current 190Mt JORC Inferred Resource, to generate significant value for shareholders
Read the full ASX announcement dated 6 October 2025 via our Investor Centre.